Routing 16 DVI cables from the server room to the projectors.

CABLES.
Lots of cables

While there are lots of cable ducts, they don’t go where we really need them to go.
And the old ducts are in the way of the air flow we also need.  So we had to remove the old cables in them, and then remove the ducts.
Its a tricky problem, because some of the cables are used daily.
Others have not been used for a long time.
Knowing which is which is very important! Some have not been used in years,
and some are vitally important to our daily operation.

Fleet Director of engineering David McGrew removes bright orange ducking in the IMAX projection booth to make room for projector air flow.
Once the ducts were removed they left a 2 foot square hole in the concrete we can use for air flow.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s