Progress Continues with Dome Surface Installation

October 15

October 15

October 23

October 26 (upper booth at left)

 

Top to bottom, behind and inside theater

Top to bottom, behind and inside theater

Tiles going in from lower level to upper. Frank still overseeing work.

Panels going in from lower level to upper. Frank still overseeing the work.

Tiles are riveted to struts. Rivets carefully Can you see the finished rivets?

Panels are riveted to struts. They are carefully aligned using the pegs. Can you see the finished rivets?

Check out the seams. Rivets are almost invisible.

Check out the seams. Rivets are almost invisible.

This is the tedious part. Panels must be cut to exact measurements so there is minimal space between each section. Coming along, right on schedule.

Advertisements

One Response

  1. This is just a test. I tried to leave a comment a few days ago and I couldn’t.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s