Posted on November 12, 2008 by maryspacetheater

Work in progress...from the cutting down below to the installing at the top.

- Almost done – early in the day Tues 11/11/08

Checking on the install. Frank is on the job too.

This is the LAST piece!!!

Cutting the last panel.

All these guys had a hand in building the dome.

The last panel going into place at 5:45pm. As this was being done, the radio was playing the Beach Boys "Sloop John B" with the words "I want to go home....." Perfect sentiment for these guys who have been away from home during this entire install.

All done! There are 393 panels in all. Stay tuned for more photos once the scaffolding is down.
Filed under: Uncategorized
Love the 4:20 on the centerpiece there! You people know your audience